Carbon Reduction Plan

UK operations only (Leeds office and team). Future US joint-venture activity is out of scope for this Plan and will be addressed separately once operational. This is an interim version, updated as data collection completes (see benchmark dates below).

1. Introduction and Commitment to achieving Net Zero

Data City Innovations Limited, trading as The Data City, is committed to achieving Net Zero greenhouse gas emissions across our UK operations by 2050 at the latest. This Plan sets out our current emissions footprint, our reduction targets, and the actions we have taken and plan to take to get there.

As a small SaaS company with a single UK office and a hybrid/remote team, the majority of our emissions footprint sits in Scope 3, not Scope 1 or 2. This is our first Carbon Reduction Plan. Some figures below are confirmed; others are actively being gathered and are shown with an expected completion date rather than left blank.

 

2. Baseline Emissions Footprint

Baseline year: 12 August 2025 – 11 August 2026, reflecting the most recent 12 months for which complete supplier billing data is available. As this is The Data City’s first Carbon Reduction Plan, the baseline year and current reporting year are the same period.

Scope 1 — Direct emissions

Zero. The Data City has no gas or fuel combustion, no on-site boilers, and no company vehicles used for business purposes. Business-owned EVs are for personal use only, with no business fuel or charging costs.

[IN PROGRESS: final confirmation of minor potential sources (e.g. air conditioning refrigerant, backup power, fuel storage) with our landlord — expected by [October 2026]]

Scope 2 — Purchased electricity

The Data City occupies its own office space in Leeds across two electricity accounts, on a 100% renewable (REGO-backed) electricity tariff, and is reporting on a market-based basis.

Total consumption for the baseline year: approximately 18,773–19,050 kWh (a small final usage figure remains outstanding due to a supplier billing cycle boundary; see note below). Location-based emissions, using the current UK grid average conversion factor, are approximately 2.46–2.50 tCO2e.

[IN PROGRESS: final kWh figure (pending a small outstanding usage period from our supplier) and the market-based emissions factor for our specific tariff — expected by [October 2026]]

One of our two electricity meters (Unit 4) came into use from 17 October 2025, partway through the reporting year; all available consumption from that date is included. No estimate has been applied for the period before connection, as no supply existed.

Scope 3

No. Category Status Expected
1 Upstream transportation & distribution Excluded. The Data City has no physical goods supply chain — we do not receive bulk physical goods shipments from suppliers. Confirmed
2 Waste generated in operations Excluded. The Data City generates only general office waste, collected via the standard council commercial waste contract. As a software/data business, no manufacturing or process waste is generated. Confirmed
3 Business travel Applies. Known travel pattern (international flights, regular rail travel) is being converted into an emissions figure. [October 2026]
4 Employee commuting Applies. Staff survey in progress to gather commuting patterns. [October 2026]
5 Downstream transportation & distribution Excluded. The Data City delivers all products and services digitally as a SaaS platform, with no physical distribution to customers. Confirmed

 

Material additions

Cloud hosting / compute — [IN PROGRESS: figure pending from provider — expected by [October 2026]]

Homeworking — [IN PROGRESS: staff survey in progress — expected by [October 2026]]

Purchased goods (Amazon consumables) — [IN PROGRESS: figures being finalised — expected by [October 2026]]

IT equipment / capital goods — [IN PROGRESS: figures being finalised — expected by [October 2026]]

Total baseline emissions

[IN PROGRESS: total will be published once the Scope 2 figure and the Scope 3 category figures above are complete — expected by [October 2026]]

 

3. Current Emissions Reporting

As this is The Data City’s first Carbon Reduction Plan, current-year emissions are the same as the baseline year figures set out in Section 2.

 

4. Emissions Reduction Targets

The Data City commits to achieving Net Zero across its UK operations by 2050 at the latest.

[IN PROGRESS: a specific interim reduction target will be published once the baseline is complete — expected by [October 2026]]

 

5. Carbon Reduction Projects

Completed

  • Leeds office operates on a renewable electricity tariff (Scope 2).
  • No company vehicle fleet used for business operations (Scope 1).
  • Digital, paperless operations as a SaaS/data business, with no physical goods supply chain or distribution.

Planned

[IN PROGRESS: planned initiatives will be published once the baseline and reduction target are confirmed — expected by [October 2026]]

 

6. Declaration and Sign-Off

This Carbon Reduction Plan will be reviewed and signed off by the board of directors (or equivalent management body) of Data City Innovations Limited.

Signed by [IN PROGRESS: to be confirmed]
Role
Date [IN PROGRESS: to be confirmed]

 

Review cycle: this Plan will be reviewed and re-signed annually, within six months of The Data City’s financial year end.